WORK AS MLA : 2004-05
 

Karveer Constituency Development Works. Year 2004-05

Details of the Work

Date

Amt. in Lakh Rs.
Village / Area/ Location Nature of the Work
Kalambe turf Kale Internal Roads WBM & Asphalting 17-02-2005 5.15
Padali Khurd Internal Roads WBM & Asphalting 17-02-2005 4.45
Bhamate Internal Roads WBM & Asphalting 17-02-2005 2.59
Donwade Construction of WC at 3 places 17-02-2005 1.38
Hanmantwadi Internal Roads and WC 17-02-2005 3.58
Bhuyewadi Internal Roads and WC 17-02-2005 1.41
Nagdevwadi RCC Gutter lines and WC 17-02-2005 6.52
Padvadwadi RCC Gutter lines 17-02-2005 3.91
Nigave Dumala WBM at Beghar Vasahat 17-02-2005 0.62
Kerli Internal Roads, Gutter lines & WC 17-02-2005 6.28
Kerli Vinchvacha mal - Water Supply project 17-02-2005 1.5
Mudshingi Tube Well at Matang Vasahat 17-02-2005 0.29
Mudshingi Tube Well at Jadhav Mal 17-02-2005 0.29
Padvadwadi Tube Well Near Aanganwadi 17-02-2005 0.29
Padvadwadi Tube Well at Fatavasti 17-02-2005 0.29
Ward 12 Kop. Mah.Nag.Palika Road Asphalting Infront of Swami Samarth Mandir - Jadhav Kirana Ghar 17-02-2005 1.33
Koparde WC 21-02-2005 1.58
Rajputwadi Roads and Gutter lines at Indira Colony and Gosavi Galli 21-02-2005 4.45
Mudshingi WC 21-02-2005 2.23
Shiyae WC 21-02-2005 3.49
Khupire Community Assembly Hall 21-02-2005 2.56
Shindewadi WBM &    Nr. Funeral land [Smashan bhoomi] 21-02-2005 0.69
Kalambe Turf Kale [Patilwadi] Construction of Water tank 21-02-2005 0.37
Ward 7 Kop. Mah.Nag.Palika Laying down drinking water line at Bhosale Park and Kadamwadi 21-02-2005 4.77
Rajputwadi Community Assembly Hall 28-02-2006 1.44
Rajputwadi Roads and Gutter lines at Indira Colony & Gosavi Galli 28-02-2006 1.84
   
Abbreviations used: WBM - water bound macadam,  WC- Shouchalay

 

-Top  | Back

 

  © www.buntypatil.com all Rights Reserved.  website design & development at SunnyZ World, Kolhapur